Deep square-edge S-shaped strips
Reading the Drawing
Use square-edge S strips with the corresponding deep square-edge carrier. The component profile and assembly section identify this connection.
Numbered Component Key
Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.
- M8 galvanized hanger rod
- 38/50 main-carrier hanger
- Deep square-edge carrier
- Deep close-joint carrier
- Deep-profile carrier
- Strip-carrier hanger
- Deep square-edge S strip
- Widths: 150 / 200 / 300 mm
- Galvanized hanger rod
- 38/50 main carrier
- Width
Installation Steps
- Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
- Use strip hangers to connect the deep square-edge strip carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
- Fit the square-edge S-shaped strips into the matching secondary-carrier clips, working in one direction.
- Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
- Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.


