Straight U-strip layout — 85 mm face / 100 mm spacing
Reading the Drawing
The straight carrier holds the U strips at the illustrated 100 mm layout spacing. Nominal face width, actual profile width and layout spacing are separate dimensions.
Component list
All dimensions in mm.
- M8 galvanized hanger rod
- 38/50 main-carrier hanger
- Straight U-strip carrier
- Light-steel main carrier
- Strip-carrier hanger
- U strip (100 mm layout)
- Galvanized hanger rod
- 38/50 main carrier
- 38/50 light-steel main carrier
Installation Steps
Components: M8 galvanized hanger rods; 38/50 light-steel main carriers; strip hangers; U-strip carriers.
- Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
- Use strip hangers to connect the U-strip carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
- Fit the U-shaped strips into the matching secondary-carrier clips, working in one direction.
- Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
- Wear clean gloves when handling finished panels.
Use the matching strip and carrier combination. Nominal face width, profile drawing width and layout spacing are different dimensions.


