U-Shaped Ceiling

Product Features

  • Removable U-profile strips can be installed in straight or inclined arrangements.
  • Each arrangement uses its own carrier profile.
  • The U-profile has an 85 mm face and 15 mm edge, with 0.5 or 0.6 mm sheet thickness.
Material
Aluminum strip
Length
Up to 6,000 mm
Thickness options
0.5 / 0.6 mm
Panel layout
Linear strips with matching carriers
  • Moisture resistance
  • Recyclable aluminum
  • Color retention*
  • Acoustic options*
  • Heat dissipation*
  • Lightweight & workable

*Color retention depends on the finish. Sound absorption requires a specified acoustic assembly; heat dissipation depends on the open or perforated layout.

Product Data

Specifications & Size Options

Technical overview
ItemSpecification
MaterialAluminum strip
LengthUp to 6,000 mm
Thickness options0.5 / 0.6 mm
Panel layoutLinear strips with matching carriers
Size and configuration options
Face width (mm)Edge height (mm)Thickness (mm)
85150.5 / 0.6

Dimensions are in millimeters unless another unit is shown. Final sizes, finish and matching components are confirmed on the approved product schedule.

System Detail

Construction & Installation

Straight U-strip layout — 85 mm face / 100 mm spacing

Straight U-strip assembly — numbered English component reference
Enlarge drawing & English key

Reading the Drawing

The straight carrier holds the U strips at the illustrated 100 mm layout spacing. Nominal face width, actual profile width and layout spacing are separate dimensions.

Numbered Component Key

Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.

  1. M8 galvanized hanger rod
  2. 38/50 main-carrier hanger
  3. Straight U-strip carrier
  4. Light-steel main carrier
  5. Strip-carrier hanger
  6. U strip (100 mm layout)
  7. Galvanized hanger rod
  8. 38/50 main carrier
  9. 38/50 light-steel main carrier

Installation Steps

Components: M8 galvanized hanger rods; 38/50 light-steel main carriers; strip hangers; U-strip carriers.

  1. Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
  2. Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
  3. Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
  4. Use strip hangers to connect the U-strip carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
  5. Fit the U-shaped strips into the matching secondary-carrier clips, working in one direction.
  6. Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
  7. Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.

Use the matching strip and carrier combination. Nominal face width, profile drawing width and layout spacing are different dimensions.

Inclined U-strip layout — 85 mm face

Inclined U-strip assembly — numbered English component reference
Enlarge drawing & English key

Reading the Drawing

Inclined-tooth U-strip carriers set the strips at an angle. The separate section shows the inclined connection and profile dimensions.

Numbered Component Key

Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.

  1. Inclined U-strip carrier
  2. Strip-carrier hanger
  3. 85 mm nominal-face U strip
  4. Galvanized hanger rod
  5. 38/50 main-carrier hanger
  6. 38/50 main carrier
  7. U strip (100 mm layout)

Installation Steps

Components: M8 galvanized hanger rods; main carriers; strip hangers; inclined U-strip carriers.

  1. Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
  2. Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
  3. Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
  4. Use strip hangers to connect the inclined U-strip carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
  5. Fit the U-shaped strips into the matching secondary-carrier clips, working in one direction.
  6. Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
  7. Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.

These system details explain the illustrated assembly. Anchor selection, structural capacity and final suspension spacing must follow the approved project drawings and local requirements. Different carrier configurations are not interchangeable.

Typical Applications

Public-building passages, airports, exhibition halls, shopping centers, stations and tunnel corridors.

A Closer Look

Product & Application Images

Project Enquiry

What to Include for a Quote

  • Reflected ceiling plan and total area
  • Module size, thickness and edge profile
  • Finish and unperforated/perforated face
  • Ceiling drop, service openings and access requirements
Request a Product Quote

Privacy settings

Browse with essential functionality only. This website does not currently run analytics, advertising trackers or embedded social widgets. Fonts are served by this website.

Essential functionality
Always available — navigation, enquiry security and your privacy preference.
Analytics & advertising
Not used. There are no optional trackers to enable.
External links
WhatsApp and other linked services open only when you choose their links. Their own privacy policies then apply.

This preference is stored in your browser, not sent to us. Leaving it unchecked does not enable tracking.

After a successful inquiry, a temporary confirmation cookie connects the submission to its thank-you page. It contains a random reference, not your contact details or drawings, and expires within 10 minutes or is cleared when used.

Read the Privacy Policy →