Hook-on strips with matching hook-on carriers
Reading the Drawing
Hook-on strips engage with matching carriers and with the adjacent strip edges. The separate profile views show the carrier and interlocking panel cross-section.
Numbered Component Key
Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.
- Strip-carrier hanger
- Hook-on strip carrier
- M8 galvanized hanger rod
- 38/50 main-carrier hanger
- 38/50 main carrier
- Profile widths: 150 / 200 / 300 / 400 mm
- Hook-on strip
- Galvanized hanger rod
- Width
Installation Steps
- Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
- Use strip hangers to connect the hook-on strip carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
- Fit the hook-on strips into the matching secondary-carrier clips, working in one direction.
- Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
- Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.