High-edge panels with V-type concealed carriers
Reading the Drawing
The raised panel edges engage with the concealed carriers. The lower drawings identify the carrier, connector and hanger.
Component list
All dimensions in mm.
- High-edge carrier
- M8 galvanized hanger rod
- No. 50 main carrier
- High-edge carrier hanger
- High-edge ceiling panel
- Carrier connector
Installation Steps
Components: M8 galvanized rods; light-steel main carriers; concealed-carrier hangers, carriers and connectors; high-edge panels.
- Measure the finished ceiling elevation from the design drawings. Mark the level line and fix the perimeter angle along the walls.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
- Use V-carrier hangers to connect the V-type concealed carriers to the main carriers. Level the secondary carriers; keep them parallel to one another and perpendicular to the main carriers.
- Align the two clip edges of the panel with the carrier slots. Gently press the panel edges upward until the returned edges engage in the carriers.
- Measure perimeter panels on site, cut them to fit and support their edges on the perimeter angle.
- Wear clean gloves when handling finished panels.


