Every Lianhui panel goes through 11 steps, from blank cutting to packing, with dimensional checks before coating (±0.5° bending, ≤1.5 mm diagonal) and adhesion and color checks after coating. This guide follows those steps for standard ceiling panels and custom wall panels, with a production traveller and the release checks at each stage.
Do all panels follow the same fabrication sequence?
| Standard ceiling panel | Custom wall or shaped panel |
|---|---|
| Material selection → blank cutting → punching → leveling → corner notching → forming → clip-position punching | Sheet cutting → marking and corner cutting → bending or roll forming → specified welding → stiffener/bracket assembly → grinding and polishing → fabrication inspection |
Both routes end with an uncoated part ready for finishing. Each panel only goes through the operations its design needs: plain panels skip perforation, and panels without welded joints skip welding.
How are part numbers and geometry established when cutting and machining?
The cutting list ties material, blank size and quantity to a panel number and drawing revision. Incoming checks confirm alloy (AA1100 standard, AA3003 on request), temper, thickness and surface condition. Blank size and diagonals are checked at cutting, the earliest point to catch the wrong material or an out-of-square blank.
Corner notches make room for the returns; CNC punching makes holes, slots and perforations. Openings and fixing holes are dimensioned from the same reference edges as the shop drawing.
How do straight bends differ from curved sections in forming?
Press brakes form straight returns; roll-forming machines make curved sections. The work instruction gives finished dimensions, return angles and the radius reference so operator and inspector measure the same thing.
Holes and notches near a bend are reviewed at drawing stage for bend relief and tool access, and critical features are machined in an agreed sequence.
Curved sections are checked against the specified radius or template, panel height and mating edges before coating.
Why assemble and finish the joints before coating?
Stiffeners, brackets and connectors are fitted to the rear of the panel at positions that match the support layout and leave installation access. Welds required by the design are completed, then ground and polished.
Adjoining shaped parts and critical corners get a trial assembly to check fit, joint width, face alignment and fixing access, because several in-tolerance dimensions can still add up to a poor visible joint.
Any change to a bracket position is recorded on both the drawing and the panel schedule.
How does one panel move through the production record?
A production traveller stays with a part through every operation. The table below records panel P-014 for a 1,200 × 600 mm layout with 10 mm joints: finished face 1,190 × 590 mm, 25 mm returns dimensioned separately.
| Operation | Information used | Release record |
|---|---|---|
| Blank cutting | Approved developed pattern for the selected sheet, bend radius and tooling | Material identity, blank length/width and quantity. Do not cut from the face dimensions. |
| Punching / notching | Hole coordinates, corner reliefs and panel orientation | First-piece hole locations and orientation checked against revision C. |
| Forming | Finished face 1,190 × 590 mm; 25 mm returns; drawing angles and tolerances | Measured face, returns and diagonals recorded after bending. |
| Rear assembly | Bracket drawing and supporting-rail locations | Bracket positions and access checked; trial fit where specified. |
| Coating release | Accepted geometry, surface preparation and finish F-07 | Part identity and finish code carried into the coating batch. |
| Packing | Zone E-02 layout and panel schedule | P-014, revision C, quantity and package number reconciled. |
If a hole moves in revision D, every P-014 part is traced at each stage: uncut material, punched blanks, formed parts and finished stock.
How do you stop a hole near a bend from distorting?
Metal around a bend stretches during forming. A hole too close can distort or tear, and a relief cut separates a local return from material that must stay flat. Hole-to-bend distance, relief shape and sequence are fixed before the cutting pattern is released; the distances depend on material and bend geometry.
Critical fixing holes are inspected after forming, because a correct flat blank can still produce an oval or shifted hole.
How is the finish pretreated, applied and cured?
Accepted parts are cleaned, degreased, rinsed, chemically pretreated and dried, then hung, coated, cured and cooled. Lianhui applies polyester powder, PVDF and wood-grain finishes at our Foshan factory.
Liquid PVDF is atomized and sprayed; powder is applied electrostatically and cured. Cure follows the coating supplier’s schedule for the actual workpiece and coating.
What acceptance criteria apply at each production inspection?
| Gate | Check | Record or action |
|---|---|---|
| Before machining | Material identity, thickness, drawing revision, blank size and quantity | Match the material and cutting list to the work order |
| Before coating | Face dimensions, squareness, returns, openings, curvature, fittings and worked joints | Hold nonconforming parts for disposition; record critical trial assemblies |
| After coating | Appearance, coverage and the specified coating properties | Compare with the retained sample and inspection requirements |
| Before packing | Panel numbers, quantities, direction marks and protection | Reconcile each package with the packing list and installation zone |
Dimensional and surface results are recorded separately: a perfect color match does not fix a wrong hole, and a correctly sized panel is held if its finish has runs, bubbles, contamination or damage.
Why approve the first piece before repeating the batch?
A first piece is inspected after the last operation that can change its critical dimensions; for folded panels, that means the finished section.
Springback changes the angle once tooling pressure is released, so a change in sheet properties, tooling or bend radius can need a setup adjustment. Acceptance uses the measured finished angle (±0.5°), and the first piece is rechecked whenever the material lot, tool setup or drawing revision changes.
How is a nonconforming panel kept out of the next operation?
A hold record lists panel ID, revision, affected feature, measured result and proposed action, and a panel on hold does not go to coating.
The options are remake, approved rework or a formally accepted deviation, approved by the person responsible for the affected interface.
What should the handover pack for the site team contain?
- Current installation layout and panel schedule, with left/right-hand pieces marked.
- Package-to-panel index linking each crate to an installation zone.
- Inspection records for critical features and closed deviations.
- Finish identification, handling guidance and labelled spare pieces.
Before each shipment, the released quantity is reconciled with the latest schedule, and outstanding special pieces such as corner panels are listed by name rather than as a percentage of area.
Why pack for installation order as well as transport?
Faces are protected with peel-off film, edges and corners with EPE foam or bubble wrap and corner guards; plywood crates are available for LCL shipments. Labels show specification, color, batch, quantity and installation direction, grouped by installation zone.
For a manufacturing enquiry, send the shop drawings and panel schedule, finish approval, inspection requirements and delivery sequence. The manufacturing page shows the equipment and full workflow; the PVDF vs powder coating guide explains the finish options. Standard ceilings are produced in 15–20 working days.