25 × 80 profiles with dedicated profile carriers
Reading the Drawing
Dedicated hangers engage the top slot of the 25 × 80 profiles and connect them to matching profile carriers.
Component list
All dimensions in mm.
- M8 galvanized hanger rod
- 38/50 main-carrier hanger
- Profile carrier
- Aluminum profile
- Dedicated profile hanger
- 25 × 80 aluminum profile
- Galvanized hanger rod
Installation Steps
- Measure the finished elevation required by the ceiling design.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Install and level the profile carriers, keeping the elevation consistent and the carriers no more than 1,200 mm apart.
- Insert the dedicated profile hanger into the top slot of the aluminum profile. Secure the member to the carrier and adjust the spacing.
- Wear clean gloves when handling finished panels.


