Teardrop baffles with B-style carriers
Reading the Drawing
Teardrop members engage with the illustrated B-style carrier arrangement. The rounded member profile and suspension connection are shown separately.
Numbered Component Key
Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.
- M8 galvanized hanger rod
- 38/50 main-carrier hanger
- Teardrop-baffle carrier
- 38/50 main carrier
- Strip-carrier hanger
- Teardrop baffle
- Galvanized hanger rod
- B-style carrier
Installation Steps
- Measure and mark the finished ceiling elevation.
- Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
- Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
- Connect the B-style baffle carriers to the main carriers using strip hangers. Keep the secondary carriers parallel to one another, perpendicular to the main carriers and no more than 1,200 mm apart.
- Clip the teardrop baffles into the B-style baffle carriers and make the final alignment adjustments.
- Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.