What is the difference between pitch and clear gap?
Pitch is centre-to-centre distance; clear gap is the open space between faces. For identical baffles, clear gap = pitch − face width. Mixing them up changes ceiling density even when the quotation shows the same number.
Label the dimension on a section in millimetres: “100 mm centre-to-centre” or “100 mm clear gap”, with the profile width alongside. “100 mm spacing” alone allows two different ceilings.
What do width and depth each change?
| Geometry | View directly below | View along the room |
|---|---|---|
| Wider face at unchanged pitch | More visible metal and less open gap | A stronger repeated band |
| Greater depth at unchanged face width | The same plan opening | More side surface and stronger screening at an angle |
| Larger pitch at unchanged profile | More open ceiling | More visible background and services |
| Round rather than rectangular section | A curved visible surface | A different light-and-shadow transition |
In a regular parallel layout, the plan opening ratio is clear gap ÷ pitch. It is geometry only, not acoustic absorption, smoke performance or ventilation free area.
| Rectangular profile face × depth | Pitch | Clear gap | Plan opening |
|---|---|---|---|
| 25 × 100 mm | 100 mm | 75 mm | 75% |
| 25 × 100 mm | 150 mm | 125 mm | 83.3% |
| 50 × 50 mm | 100 mm | 50 mm | 50% |
Rows one and two use the same profile at different pitches; row three also changes face width. Perimeter trims and interruptions lower the open area of the whole ceiling.
Which Lianhui profiles can create these effects?
Square-tube baffles come in 25 × 80, 25 × 100, 30 × 100 and 50 × 50 mm sections with 0.7, 0.8, 0.9 or 1.0 mm walls. Round-tube baffles are Ø50 mm with a 0.8 mm wall. Lengths go up to 6,000 mm, and finishes are powder, PVDF or wood-grain. Show the face orientation of rectangular sections on the drawing.
A 25 × 100 mm rectangle and a 50 mm tube look very different from the side, so a profile change alters visible depth, background and lighting, not just the color.
How does spacing change the quantity you buy?
For continuous parallel rows, baffle length per m² ≈ 1 ÷ pitch in metres, before perimeter, cutting and interruptions: 10 linear m/m² at 100 mm pitch, 6.67 linear m/m² at 150 mm.
Going from 100 to 150 mm pitch cuts baffle length by a third and shows more background. Compare quotes at the same pitch before comparing price per m².
List carriers, suspension, end caps, perimeter and lighting integration as separate lines; a third less baffle is not a third off the installed cost. Lianhui supplies matching carriers with every baffle order; MOQ is 150–200 m².
From where should the design be judged?
Check the view from the entrance, along the usual walking direction and directly below. A layout open in plan can hide the plenum when seen along deep parallel profiles, and rotating the baffle direction changes this without changing the section.
- Mark the main viewing directions on the reflected ceiling plan.
- Show the finished level and the background above the baffles.
- Run linear lighting with the baffles or cross them as a planned feature.
- Keep access routes to serviceable equipment clear.
- Support fixtures from their own supports, not from the baffles.
Does a deeper baffle automatically absorb more sound?
Depth is geometry. Sound absorption comes from material, perforation, absorber and arrangement, so acoustic targets need a specified acoustic treatment with test data. See acoustic metal ceilings: echo vs isolation.
What should the final ceiling schedule contain?
List profile section and orientation, wall thickness, finish, length, centre-to-centre pitch, resulting clear gap and suspension system, with enlarged details at lights, sprinklers, walls and access zones.
Pick a 25 mm face for a lighter pattern from below, with depth set for screening at an angle; a 50 mm face for a denser band at the same pitch; and the round tube for its curved silhouette and softer light transition.
Then match the profile to its carrier with the baffle carrier guide.
Buying in volume? Standard ceilings ship from 150–200 m² in 15–20 working days. Get wholesale prices → · Custom project? Send drawings →


