+86 180 2450 8117 info@lianhuicz.com Foshan, Guangdong, China
Lianhui / Aluminum Ceiling System

B-Type Baffle Ceiling

Product Features

  • Open baffle runs leave ventilation paths while screening pipework above the ceiling.
  • Individual strips clip onto the carrier and can be removed for maintenance.
  • Nominal profiles are 100, 125, 150 and 200 mm, with lengths up to 6,000 mm.
Material
Aluminum
Length
Up to 6,000 mm
Suspension system
Matching carrier or hanging system
Configuration
B-style hanging baffle
  • Moisture resistance
  • Recyclable aluminum
  • Color retention*
  • Acoustic options*
  • Heat dissipation*
  • Lightweight & workable

*Color retention depends on the finish. Sound absorption requires a specified acoustic assembly; heat dissipation depends on the open or perforated layout.

Product Data

Specifications & Size Options

Technical overview
ItemSpecification
MaterialAluminum
LengthUp to 6,000 mm
Suspension systemMatching carrier or hanging system
ConfigurationB-style hanging baffle
Thickness increment0.1 mm within the thickness range
Size and configuration options
Nominal profile size (mm)Thickness (mm)Spacing (mm)
1000.40–0.80100
1250.40–0.80100
1500.40–0.80100
2000.50–0.80100

Dimensions are in millimeters unless another unit is shown. Final sizes, finish and matching components are confirmed on the approved product schedule.

System Detail

Construction & Installation

B-style baffles with B-style carriers

B-style baffle assembly — numbered English component reference
Enlarge drawing & English key

Reading the Drawing

The B-style carriers run across the main carriers. Hanging strips clip into the repeated carrier teeth; the section shows the suspended connection.

Numbered Component Key

Match each number to the label below. Dimensions shown on the drawing are in millimeters unless noted.

  1. M8 galvanized hanger rod
  2. 38/50 main-carrier hanger
  3. B-style carrier
  4. 38/50 main carrier
  5. Strip-carrier hanger
  6. B-style baffle
  7. Galvanized hanger rod
  8. Height: 100 / 125 / 150 / 200 mm
  9. Profile height

Installation Steps

  1. Measure and mark the finished ceiling elevation.
  2. Establish the installation direction. Drill suspension points in the structural ceiling at no more than 1,200 mm spacing and secure the galvanized hanger rods with expansion anchors.
  3. Fit the main-carrier hangers and light-steel main carriers. Adjust their height and level, keeping the carriers parallel.
  4. Connect the B-style baffle carriers to the main carriers using strip hangers. Keep the secondary carriers parallel to one another, perpendicular to the main carriers and no more than 1,200 mm apart.
  5. Clip the B-style baffles into the B-style baffle carriers and make the final alignment adjustments.
  6. Keep hands clean during installation. Avoid sweat, oil and other contamination on the finished surface.

These system details explain the illustrated assembly. Anchor selection, structural capacity and final suspension spacing must follow the approved project drawings and local requirements. Different carrier configurations are not interchangeable.

Typical Applications

Public-building passages, airports, exhibition halls, shopping centers, stations and tunnel corridors.

A Closer Look

Product & Application Images

Project Enquiry

What to Include for a Quote

  • Ceiling plan and direction of the runs
  • Face width, depth, length and clear spacing
  • Finish and end treatment
  • Ceiling drop and positions of lights, sprinklers and air outlets
Request a Product Quote

Privacy settings

Browse with essential functionality only. This website does not currently run analytics, advertising trackers or embedded social widgets. Fonts are served by this website.

Essential functionality
Always available — navigation, enquiry security and your privacy preference.
Analytics & advertising
Not used. There are no optional trackers to enable.
External links
WhatsApp and other linked services open only when you choose their links. Their own privacy policies then apply.

This preference is stored in your browser, not sent to us. Leaving it unchecked does not enable tracking.

After a successful inquiry, a temporary confirmation cookie connects the submission to its thank-you page. It contains a random reference, not your contact details or drawings, and expires within 10 minutes or is cleared when used.

Read the Privacy Policy →